Estimates fail not because AI is involved, but because black-box systems hide the “why” behind every quantity, classification, or scope decision — leaving you no way to check whether the interpretation was right. And when you can’t trace a number back to a specific sheet, detail, or revision, that risk rolls directly into your bid.
A 2024 industry evaluation illustrated this clearly: an AI model performed well on standard rooms but under-counted framing and stair details by more than 10% on irregular plans. Plexxis highlighted this gap publicly — the output looked polished, but there was no traceable reasoning behind it. For an estimator, that’s the nightmare scenario: the number looks believable, but the logic is sealed inside the model.
And this isn’t theoretical. In preconstruction, even a 2–3% miss on concrete, utilities, or excavation can swing a bid from competitive to exposed. If AI can’t show which sheet it used, how it handled addenda, or why it chose one classification over another, you can’t defend that number to your PM or owner.
That’s why the right vendor questions go beyond “How accurate is it?” You should be able to click a number and see the exact sheets, callouts, and geometry the model relied on — not just a final total. If you can’t override a misclassification, correct a boundary, or adjust logic, then the tool is making decisions you can’t defend –and that’s exactly where Beam AI stands apart.
Beam AI automatically extracts material quantities, tracks every plan change, and lets you resubmit your takeoff in a few clicks. You can auto-detect revisions, compare versions side-by-side, export clean variance reports, preserve custom work, and stay bid-ready without redoing takeoffs. Contractors are already using it to handle addenda in hours, not weeks — with zero rework. Book a demo to see Beam AI in action!