JPR Lighting Group Increases Bid Capacity and Saves Days on Large Takeoffs
About JPR Lighting Group
JPR Lighting Group is a New York-based electrical and lighting contractor that prepares estimates for projects ranging from smaller commercial jobs to large, complex tower developments.
Challenges Before Beam AI
Before implementing Beam AI, JPR Lighting Group relied on manual takeoffs using Stack, creating several challenges:
- Manual takeoffs consumed most of the estimator's day.
- Large tower projects often required up to 2 days to complete manually.
- Completing one large takeoff frequently delayed other high-priority tasks.
- Limited estimating capacity made it difficult to prepare additional quotes and pursue more bidding opportunities.
“Large tower projects that would normally take me a couple of days to complete manually can now be sent to Beam AI. That gives me those days back to focus on other priorities, complete more takeoffs, prepare quotes, and manage additional bids.”
Kimberly Ramirez
Estimator
JPR Lighting Group
Breaking Down Key Wins
After adopting Beam AI, JPR Lighting Group experienced significant productivity improvements:
- Large takeoffs that previously required several days can now be processed through Beam AI, saving hours to multiple days depending on project size.
- Estimators use the time saved to complete additional takeoffs, prepare quotes & manage more bids simultaneously.
- Bid volume has increased because the team can complete more estimates within the same timeframe.
- Auto-detection of specification details and keyed notes provides quick access to project requirements without having to manually search through hundreds of pages.
- The updated platform is easier to navigate, improving the overall estimating experience.
Business Impact
Beam AI has helped JPR Lighting Group increase estimating capacity, allowing estimators to focus on higher-value work.
- Saves hours to several days on takeoffs, depending on project complexity.
- Increased bid volume by enabling the team to complete more takeoffs.
- Estimators spend less time measuring plans and more time preparing quotes, reviewing estimates & managing active bids.
- Automatically extracted specifications and keyed notes reduce the time spent searching through drawing sets.
- Responsive customer support and continuous product improvements have made adoption smooth & effective.
“Before Beam AI, I spent most of my day completing manual takeoffs, and large tower projects could take a couple of days. Now I can send those projects to Beam AI and spend that time completing additional takeoffs, preparing quotes, and managing more bids.”
Kimberly Ramirez
Estimator
JPR Lighting Group
Hear It Straight from Our Customers


Concrete & Rebar
S&C Concrete saves 80% of takeoff time and completes large bids in hours with Beam AI
S&C Concrete specializes in concrete construction and restoration across Idaho’s Wood River Valley, offering foundations, slabs, architectural concrete, and structural repairs.


HVAC/Mechanical
Fertado Heating and Air saves 2 days per takeoff & increases estimating capacity with Beam AI
Fertado Heating and Air, Inc. is a full-service HVAC and architectural sheet metal contractor serving the San Francisco Bay Area for over 20 years.


Landscape & Irrigation
Transitions Outdoor Services accelerates proposal turnaround & improves productivity
Founded in 1999, Transitions Outdoor Services is a Southeast Michigan landscaping company offering landscape design, construction, lawn maintenance, irrigation, drainage, and year-round outdoor services.