Ayers Mechanical Saves 5 Days/ Takeoff, and Increases Bid Volume by 25%
About Ayers Mechanical
Ayers Mechanical Group provides heating, air conditioning, and plumbing services to commercial, industrial, and residential customers in Van Wert, Ohio.
Challenges Before Beam AI
Before adopting Beam AI, Ayers Mechanical relied entirely on manual takeoffs, which created significant bottlenecks:
- Takeoffs were done using pen and paper, making the process time-consuming and difficult to scale.
- Large projects could take up to two weeks to complete, limiting the number of bids the team could pursue.
- Estimating capacity was constrained by available manpower, with no easy way to increase output without hiring.
- Tight bid deadlines were difficult to meet, causing the team to miss out on certain opportunities.
- A significant portion of time was spent on manual execution rather than optimizing estimates or strategy.
“Time saved is going into estimating more jobs. Our goal is to do 2x the takeoffs with the same team in place, with Beam AI.”
David Lentz
COO
Ayers Mechanical
Breaking Down Key Wins
With Beam AI, Ayers Mechanical has transformed its estimating workflow, enabling faster turnaround and higher bid capacity.
- Takeoffs that previously took days or weeks are now completed in 36 hours to a few days, saving 3–5 days per project.
- Faster turnaround has improved bid submission timelines by up to a week, allowing the team to respond to tight deadlines.
- The team is now using the time saved to estimate more projects, with a goal to 2X takeoff volume using the same team.
- Increased bid volume has directly contributed to winning more jobs.
- Beam AI enabled the team to successfully bid a hotel project under a one-week deadline, which would be impossible with manual workflows.
- Beam AI’s ability to manage multiple takeoffs simultaneously has increased the work backlog by 25%. The highest the team has ever seen.
Business Impact
- Increased backlog of work by 25%.
- Higher bid volume without expanding the team.
- Faster turnaround on time-sensitive bids.
- Improved ability to compete for larger and tighter deadline projects.
- Reduced dependency on manual estimating workflows.
“What used to take us two weeks to complete by hand, was completed within 36 hours when we told the BeamAi team we had a turnaround.”
David Lentz
COO
Ayers Mechanical
Hear It Straight from Our Customers


Concrete & Rebar
S&C Concrete saves 80% of takeoff time and completes large bids in hours with Beam AI
S&C Concrete specializes in concrete construction and restoration across Idaho’s Wood River Valley, offering foundations, slabs, architectural concrete, and structural repairs.


HVAC/Mechanical
Fertado Heating and Air saves 2 days per takeoff & increases estimating capacity with Beam AI
Fertado Heating and Air, Inc. is a full-service HVAC and architectural sheet metal contractor serving the San Francisco Bay Area for over 20 years.


Landscape & Irrigation
Transitions Outdoor Services accelerates proposal turnaround & improves productivity
Founded in 1999, Transitions Outdoor Services is a Southeast Michigan landscaping company offering landscape design, construction, lawn maintenance, irrigation, drainage, and year-round outdoor services.